The House of Cherry Family

The building progress of our first house in QLD, Australia.

Friday, April 17, 2009

Driveway and foot path prepping


Right side foot path of the front door.


Left side of the front door


Prepping the driveway










Outside the alfresco


Right side of the house


The backyard


Prepping the slab for garden shed




the bobcat got stuck in the mud

Scheduled pouring of concrete is on Monday

Labels: ,

Thursday, April 9, 2009

Alfresco tiling


Half done tiling of alfresco


other half, needs more adhesive

Labels:

Tuesday, April 7, 2009

Tiling the front porch and painting the garage floor


Photos of the front porch without tiles


Tile cutter and tiles


Laying of tiles


Almost done


Half of the garage done painting






The boy writing on the garage floor


And the girl writing on the floor too, while the Dad paints the sides and corners first

Labels: , ,

First day at new house


Family room


Kitchen - the benchtop and cooktop are full of bags and stuffs


boxes in the office


a bit tidier looking dining area


Ethan's bedroom


Krystina's bedroom


Formal lounge


Untidy looking lounge

Labels: ,

Moving day











Labels: , ,