Monday, December 29, 2008

Pre handover pictures

Please keep watching for more updates.

Tuesday, December 16, 2008

Electrical works has started...


Cutting of holes for downlights for the family room


Wall lights and smoke alarms installed



Finished toilet tiles


And sample of plantation shutters for the lounge and study.

Labels: , ,

Monday, December 15, 2008

More lights and kitchen appliances


Sink with vegetable spray tap


Dining area with modern lights


Masters bedroom with fan and downlights


Ensuite light with extractor fan


Kitchen lights


Hot water cylinder


Shower screens


Bigger photo of the dining lights


The built-in oven, stove and rangehood


Dishwasher

Friday, December 5, 2008

Tiles

As of yesterday....



The finished painting of the walls.



Tiling the bathroom.



And the black tiles of the kitchen stove wall.


*waiting for installation of solar panel and rain water tanks*

Labels: , ,

Thursday, December 4, 2008

Painting and the hole in the wall

We have made an appointment to let us in yesterday with the carpet man to measure the floor for carpet and vinyl tiles. The ceiling is painted white and the walls are cream. Painting was almost done except for the bathroom, kitchen area and outside of the house.

This morning the tiler was doing the kitchen and bathrooms and should be finished today, just waiting for the pictures and will upload as soon as possible.


Lounge area, to the right is the main door.


The garage with rain water tanks and tiles.


The unfinished brick work left for the the frame inspector.


The kitchen cupboards, motiff is black and white


Another view of the kitchen


view from dining area

the house owner and his garage :-)

Labels: , ,