Fixing stage
We are now locked up and onto fixing stage.
That means we can't get inside the house without the workers/subcontractors actually being there.
Photos of the kitchen is taken from outside the kitchen window hence the glare and blurry effect.

Kithen installation supposed to start from the 26th of Nov
but we're surprised that it's done.

A better photo of kitchen showing where the stove goes.

The empty wall is for (top) microwave, (bottom) wall oven
and space for the fridge.

A shiny double sink.
That means we can't get inside the house without the workers/subcontractors actually being there.
Photos of the kitchen is taken from outside the kitchen window hence the glare and blurry effect.

Kithen installation supposed to start from the 26th of Nov
but we're surprised that it's done.

A better photo of kitchen showing where the stove goes.

The empty wall is for (top) microwave, (bottom) wall oven
and space for the fridge.

A shiny double sink.
Labels: cabinets, kitchen cupboards

0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home